Topsoil Calculator
By BRIX Editorial Team · Updated
To figure topsoil, multiply the area in square feet by the depth in feet and divide by 27 for cubic yards. Penn State Extension calls for at least 4–6 inches of settled topsoil for a new lawn. A 50 × 40 ft lawn at 4 inches needs 24.7 cubic yards, plus extra for settling.
- Area
- 2,000 sq ft
- Volume at settled depth
- 667 cu ft (24.69 yd)
- Bags (1 cu ft each)
- 667
- Weight, upper estimate
- up to 36.7 tons
2,000 sq ft at 4 in is 24.69 yards. Wet soil is heavy: this order could weigh up to 36.7 tons, so check your truck's payload rating before you haul it yourself.
Key takeaways
- Cubic yards = length × width × (depth in ÷ 12) ÷ 27.
- Penn State Extension: a new lawn needs at least 4–6 in of good topsoil, measured as a firmed or settled depth.
- Oregon State Extension suggests about 8 in of soil for most vegetables in raised beds.
- Loose soil settles after rolling and watering, so order more than the settled volume.
- Soil is heavy: Nebraska DOT figures 110 lb per cubic foot compacted, about 2,970 lb per yard.
How do you calculate how much topsoil you need?
Multiply the area by the depth you want after the soil settles, convert to cubic yards, then add an allowance for settling. Bulk topsoil is sold by the cubic yard; bagged topsoil by the cubic foot.
Cubic yards = L × W × (D ÷ 12) ÷ 27 × (1 + settling)
- L, W
- length and width in feet
- D
- settled depth in inches
- settling
- extra loose soil to order, as a decimal
- 1
Measure the area.
Length × width for each lawn section or bed. For beds, multiply by the number of beds.
- 2
Choose a settled depth.
4–6 in for a new lawn, about 8 in for a vegetable bed, 1–2 in to fill low spots or level an existing lawn.
- 3
Convert to cubic yards.
Multiply by depth in feet and divide by 27.
- 4
Add for settling.
Loose screened soil firms down after it's rolled and watered. Add extra so you end at your target depth.
- 5
Plan the haul.
Check truck payload and the supplier's delivery minimum before you choose bulk or bags.
For raised beds, 3 beds of 8 × 4 ft filled 8 in deep take 64 cu ft, or 2.37 yards. In 1 cu ft bags that's 64 bags, so a bulk delivery of soil or a soil-compost blend is usually easier.
How deep should topsoil be?
| Job | Depth | Source or note |
|---|---|---|
| New lawn from seed or sod | 4–6 in, settled | Penn State Extension: minimum for a new lawn |
| Raised vegetable beds | about 8 in | Oregon State Extension: adequate rooting for most vegetables |
| Tilling in an existing garden | about 6 in | Oregon State Extension: rototill to about 6 in |
| Leveling low spots in a lawn | thin layers | Spread thin so the grass can grow through, and repeat |
| Regrading next to a foundation | varies | Keep the grade sloping away from the house |
How much topsoil for common jobs?
| Job | Size and depth | Cubic yards | 1 cu ft bags |
|---|---|---|---|
| Small lawn patch | 20 × 20 ft, 4 in | 4.94 | 134 |
| Front yard, new lawn | 50 × 40 ft, 4 in | 24.69 | 667 |
| Front yard at 6 in | 50 × 40 ft, 6 in | 37.04 | 1,000 |
| Backyard, new lawn | 80 × 60 ft, 4 in | 59.26 | 1,600 |
| Raised beds | 3 × 8 × 4 ft, 8 in | 2.37 | 64 |
How much does a yard of topsoil weigh?
It depends on texture and moisture. Nebraska DOT's estimating guide uses 110 lb per cubic foot for compacted soil in place, which is about 2,970 lb (1.49 tons) per cubic yard. Loose, dry, screened topsoil weighs less, but wet soil can approach that figure, so use it as the upper end when you plan trucks and trailers.
Common topsoil estimating mistakes
- Ordering the settled depth as loose volume. Penn State's 4–6 in is a firmed depth. Order extra loose soil to end up there.
- Underestimating weight. A single yard can weigh well over a ton. Check payload ratings before hauling.
- Skipping a soil test. Penn State recommends testing soil before establishing a lawn. Lime and fertilizer are separate line items.
- Burying grass without stripping it. Thick layers over existing turf or debris cause uneven settling. Price site prep on its own line.
- Forgetting access. A dump truck needs a place to drop the pile. Price wheelbarrow or skid-steer time from the pile to the work.
Frequently asked questions
How much topsoil do I need for a new lawn?
Penn State Extension recommends at least 4–6 in of good-quality topsoil, measured as a settled depth. For 1,000 sq ft at 4 in, that's about 12.3 cubic yards before any settling allowance.
How many square feet does a yard of topsoil cover?
One cubic yard covers 324 sq ft at 1 in, 81 sq ft at 4 in and 54 sq ft at 6 in. Divide 324 by the depth in inches.
How much does a cubic yard of topsoil weigh?
Roughly a ton or more, depending on moisture and texture. Nebraska DOT uses 110 lb per cubic foot for compacted soil, about 2,970 lb per yard. Loose, dry topsoil is lighter.
How much extra topsoil should I order for settling?
There's no single number; it depends on how loose the soil is delivered and how it's firmed. Because recommended lawn depths are settled depths, order more than the settled volume and keep a little on site to top off low spots.
How many bags of topsoil make a yard?
A cubic yard is 27 cu ft, so it's 27 bags of 1 cu ft or 36 bags of 0.75 cu ft. Past a yard or two, bulk delivery is usually far less handling.
Related
- Mulch CalculatorFree mulch calculator: enter bed size and depth to get cubic yards for bulk delivery and 2 cu ft bag counts, including round tree rings.
- Gravel CalculatorFree gravel calculator: get cubic yards and tons of crushed stone, pea gravel or river rock for driveways, paths and pads, with compaction built in.
- Job Pricing Calculator for ContractorsPrice any job for profit: enter labor hours, burdened rate, materials, overhead and target profit to get the price to quote, your margin and markup.
- Markup and Margin CalculatorConvert markup to margin and margin to markup, or find both from cost and price. Free calculator with a markup-to-margin chart and trade examples.
- Maintenance Agreement Pricing CalculatorPrice HVAC, plumbing, pest control and lawn care maintenance agreements from your real costs. Get yearly and monthly prices, margin and tech hours needed.
- Estimate vs. Quote vs. Bid: What's the Difference?Estimate, quote, bid and proposal explained for contractors: how binding each is, when to use which, a side-by-side table, and how to word yours.
- Contractor estimating software that quotes on site and chases every open estimateBuild contractor quotes on site, follow up every open estimate by text and email, and turn won work into jobs, invoices and QuickBooks entries.
- Landscaping Software That Handles the Office All YearLandscaping software that answers spring-rush calls, books estimates, follows up bids, invoices recurring work and snow, and keeps QuickBooks clean.
- Roofing CalculatorFree roofing calculator: turn a footprint and pitch into roof square footage, squares and shingle bundles, with waste, starter, ridge cap and underlayment.
- Concrete CalculatorFree concrete calculator for slabs, footings and columns. Get cubic yards for ready-mix and 40, 60 or 80 lb bag counts, with waste built in.
Sources
- Penn State Extension — Lawn Establishment (checked October 12, 2026)
- Oregon State University Extension — FS 270, Raised Bed Gardening (checked October 12, 2026)
- Nebraska DOT — Estimating Quantities in English & Metric (2024) (checked October 12, 2026)