Contractor Estimate Template

By BRIX Editorial Team · Updated

A contractor estimate template is a fill-in form for pricing a job before work starts. It covers the scope of work, an itemized price, optional add-ons, what's not included, the schedule, deposit and payment terms, how long the price is good for, and a signature line so the customer's approval turns it into a go-ahead.

Key takeaways

  • The full template is below, plus a printable version you can type into and save as a PDF.
  • Write the scope so a homeowner can picture the finished job. Vague scope is where most disputes start.
  • List exclusions and how you'll handle hidden conditions. They protect your margin more than any other line.
  • Put an expiration date on it and follow up. Most estimates are won or lost in the follow-up, not the first visit.

The free contractor estimate template

Copy the template into your own document or download the printable version. In the printable file, click any field to type, then print it or save it as a PDF to send.

ESTIMATE

From

Business name: ____________________

Address / phone / email: ____________________

Contractor license #: ____________ (if required)

Estimate details

Estimate #: ________ Date: ________ Valid until: ________

Prepared by: ____________________

Customer and job site

Customer name: ____________________ Phone / email: ____________________

Job address: ____________________ Site visit date: ________

Scope of work

What we will do: ______________________________

Materials / equipment (brand, model, size): ______________________________

What the finished job includes (cleanup, testing, walkthrough): ______________________________

Price breakdown (description · qty · unit price · amount)

Equipment / materials: ________ · ___ · $___ · $_____

Labor: ________ · ___ · $___ · $_____

Other: ________ · ___ · $___ · $_____

Permits / disposal: ________ · ___ · $___ · $_____

Subtotal: $_____ Sales tax (if applicable): $_____

ESTIMATE TOTAL: $_____

Optional add-ons (initial to accept)

Option 1: ________________ $_____ Initials: ____

Option 2: ________________ $_____ Initials: ____

Not included

Exclusions: ______________________________ (e.g. drywall repair, painting, electrical upgrades)

Terms

Estimated start: ________ Estimated duration: ________

Deposit due at approval: $_____ (check your state's deposit limits) Balance due: ________

Changes to this scope require a signed change order before the work is done.

Hidden conditions (rot, code violations, damaged lines found after work starts) will be shown to you and priced on a change order before we proceed.

Warranty: ____ labor; manufacturer warranty on equipment and parts.

This estimate is valid for ___ days from the date above.

Acceptance

By signing, you approve the scope, price and terms above and authorize us to schedule the work.

Customer signature: ____________________ Printed name: ____________ Date: ________

Contractor signature: ____________________ Date: ________

What should a contractor estimate include?

A good estimate answers every question a customer will ask before they ask it: what exactly you'll do, what it costs, what isn't included, when you can start, what they pay upfront, and what happens if something changes. Each section of the template does one of those jobs.

Estimate sections and what they protect
SectionWhat it does for you
Scope of workDefines the job. If it's not in the scope, it's a change order. Write it in the customer's language, not part numbers. See scope of work.
Itemized priceShows the customer where the money goes and makes it easy to remove an item instead of cutting your whole price.
Optional add-onsLets the customer buy more without a second visit. Initials on each option make the choice clear.
ExclusionsStops "I thought that was included." The most underused line in trades estimates.
Hidden conditions clauseSets expectations before you open a wall or pull a toilet and find rot.
Deposit and payment termsCovers materials and commits the customer. Some states cap home improvement deposits; see contractor deposit laws.
Valid-until dateProtects you from material price changes and gives you a natural reason to follow up.
SignatureTurns the estimate into an approval. Many contractors treat a signed estimate as the contract on small jobs.

Estimates, quotes and bids get used interchangeably, but there are differences in how binding the number is. See estimate vs. quote vs. bid if your customers or local rules treat them differently.

Filled example: heat pump replacement estimate

Here's the template filled out for an HVAC job: replacing a failed 3-ton split system with a heat pump and matching air handler. The prices are illustrative, not market rates.

Estimate #E-2318, valid 30 days
DescriptionQtyUnit priceAmount
3-ton heat pump and matching air handler (brand/model listed), with pad and disconnect1$7,800.00$7,800.00
Installation labor: 2 technicians, 1 day; remove old system, set new equipment, start-up and test1$2,400.00$2,400.00
Line set flush, new condensate line, electrical whip, refrigerant and materials1$650.00$650.00
Mechanical permit and inspection1$150.00$150.00
Haul away and recycle old equipment1$100.00$100.00
Estimate total$11,100.00
Option A: smart thermostat, installed (initial to accept)1$350.00$350.00
Option B: 10-year labor warranty (initial to accept)1$495.00$495.00
Illustrative prices. Exclusions on this estimate: ductwork modifications, drywall or ceiling repair, electrical panel upgrades. Deposit $1,000 at approval, balance on completion.

How do estimates differ by trade?

Estimate details to add by trade
TradeAdd to the scope or priceCommon exclusions to list
HVACEquipment model numbers, tonnage, efficiency rating, thermostat, good-better-best optionsDuct changes, electrical upgrades, drywall repair
PlumbingFixture models, pipe material, shutoff and access plan, permitWall and floor repair after access, code upgrades found during work
ElectricalPanel size, circuits, device counts, permit and inspectionUtility company fees and scheduling, patching and painting
RoofingSquares, tear-off layers, underlayment, flashing, decking allowance per sheetDecking over the allowance, gutters, interior damage
RemodelingAllowances for fixtures and finishes, demo, phases, payment scheduleHidden structural or water damage, owner-supplied materials
LandscapingSquare footage, plant list and sizes, material yards, irrigation zonesGrading beyond plan, utility locates delays, plant warranty limits
PaintingRooms or surfaces, coats, prep level, paint brand and sheenDrywall repair beyond minor patching, lead-safe work if not quoted

Common estimate mistakes

  • A one-line price. "Replace AC: $11,100" makes the customer compare you to the cheapest number they got. Itemize and explain.
  • No exclusions. Anything you don't exclude, a customer can argue was included.
  • No expiration date. Material prices move. A 30-day window protects you and gives you a reason to call back.
  • Pricing at cost on hidden conditions. Say upfront that surprises get a change order at your normal markup. See change order.
  • Not following up. Sending the estimate is half the job. Use the estimate follow-up templates.
  • Underpricing overhead. Make sure the price covers overhead and profit, not just parts and labor. The job pricing calculator helps.

Frequently asked questions

Is a signed estimate a contract?

Often it works as one on small jobs, because it has a scope, a price and the customer's signature. Whether it's enforceable depends on your state and what the document says. Larger jobs and home improvement work in some states need a formal contract with specific notices.

How long should an estimate be valid?

Thirty days is common for service and replacement work. Use a shorter window when material prices are volatile and a longer one for seasonal work you're booking ahead. Whatever you pick, print the actual expiration date on the estimate.

Should I charge for estimates?

Many service contractors give free replacement estimates but charge a diagnostic or trip fee for repair visits. Some charge for detailed design estimates and credit the fee if the customer hires them. Say which applies before you arrive.

How much deposit can a contractor ask for?

It depends on your state. Some states cap deposits on home improvement contracts, and others leave it to the contract. Check your state's rules before you set a deposit. Our contractor deposit laws page links the state sources.

What's the difference between an estimate and an invoice?

An estimate prices the work before it's done and asks for approval. An invoice bills for work that's finished and asks for payment. A good invoice references the approved estimate number so the customer can see the price didn't change.

Should I show good-better-best options on an estimate?

For replacement work, often yes. Three clear options let the customer choose instead of deciding yes or no on one price. Keep each option's scope distinct and priced in full. See our good-better-best pricing guide.

Written by BRIX Editorial Team. Published October 19, 2026. Last updated October 19, 2026.

How we research and update pages: editorial policy.

Let BRIX run the phones and the books.
You run the work.

BRIX answers every call, follows up every lead, sends the quotes and invoices, and keeps QuickBooks tax-ready.

Call now(518) 588-1122Text